Can I specify 3, 6 or 12 sachets?
Include every required pack count in your enquiry, along with its sachet arrangement and carton drawing. Compatibility, format parts and the feeding method must be reviewed for each pack; a count alone does not establish suitability.
Does this machine make or seal condoms?
No. This page concerns putting already sealed individual condom sachets into folding cartons. Condom manufacture and primary sachet sealing are different operations and need a separate equipment scope.
Tuck closure or adhesive closure?
Define the required finished pack first. Compare flap engagement, opening experience, any evidence-of-opening requirement, consumables and cleaning. Ask for the closure tooling and trial result proposed for your carton rather than assuming either method meets every requirement.
How is machine output confirmed?
Request an accepted-output test with the specified sachets, carton, leaflet, count and closure. Record the duration, accepted packs, rejects and stops. Confirm the rating of the proposed machine in its datasheet and distinguish it from the sustained output of your pack.
What should be checked at FAT?
Agree the sample formats, count and leaflet checks, sachet condition after insertion, closure, reject handling, alarms, interfaces and changeover demonstration. The FAT record should report the agreed tests and results; it does not replace qualification or acceptance at the installation site.
Is a leaflet always included?
State whether each SKU needs a leaflet. If it does, provide the unfolded sheet, paper, fold pattern and placement requirement. Include folding, insertion and the required missing-leaflet response in the quotation; do not infer them from a photograph of an assembly.
What determines price and delivery?
Feeding, grouping, format parts, closure, coding, inspection, controls, interfaces, documentation and service scope affect the quotation. Production timing also depends on the agreed specification, samples and testing. Ask for itemized scope and written commercial terms rather than a generic fixed price or lead time.
Can it connect to other equipment?
Review the layout, upstream discharge, downstream capacity, conveyor heights, accumulation and control signals. Define which supplier owns every interface and the response to stops or rejected cartons. Integration is a project scope, not an automatic feature of every cartoner.