Opens in a new tab

Commercial blister-machine comparison · evidence first

DPP‑260 vs DPP‑140 Blister Machine

Compare the two platforms through your product, finished blister, accepted-output target, line interfaces and FAT evidence—not an unverified model-name shortcut.

Product and pack fit Accepted output Tooling and changeover FAT proof
HIJ DPP-260 automatic blister packing machine platform
DPP-260 platform reference. The signed quotation must identify the final station, feeder, tooling, control and documentation scope.
1. Define the productDimensions, fragility, orientation, dust, samples and contact requirements.
2. Freeze the packCavity drawing, materials, depth, pitch, seal, print and cut criteria.
3. Calculate outputAccepted packs per minute after stops, rejects and planned operating factor.
4. Approve the proofFAT method, sampling, acceptance limits, deviations and retained records.

Quick decision

Do not choose by model number alone

The DPP-260 has a documented medium-speed flat-plate reference configuration. A DPP-140 proposal must be compared from its own current technical offer, because the available project evidence does not establish one universal DPP-140 configuration.

Documented reference

DPP-260 project

Shortlist this route when the approved blister drawing, material system, feeder and required accepted output fit the documented DPP-260 platform and its configured stations.

  • Alu-PVC and configured Alu-Alu project routes are documented.
  • Reference feed stroke is 40–120 mm and maximum forming area is 245 × 112 mm.
  • Reference output must still be recalculated from packs per cycle and proved with the actual product.
Offer-controlled scope

DPP-140 project

Treat the DPP-140 as a supplier-configured alternative until its current data sheet, layout, tooling basis and FAT proposal are attached to the quotation.

  • Confirm the exact forming area, stroke, forming route and product family.
  • Confirm feeder, inspection, rejection, coding and downstream interfaces.
  • Require the same accepted-output test and evidence boundary used for the DPP-260.
Practical rule: a smaller machine is not automatically the better pilot machine, and a larger machine is not automatically the better production machine. The correct choice is the smallest configuration that can repeatedly make the approved pack, meet the accepted-output target and produce the required evidence.

Evidence boundary

Know what is verified before comparing

This separates technical-document values from quotation-controlled items. It prevents a neat comparison table from creating false certainty.

245 × 112 mmDPP-260 reference maximum forming area
40–120 mmDPP-260 reference feed-stroke range
10–60/minDPP-260 described adjustable punching-frequency range

Before using any value in a purchase decision

  • Match the value to the exact offered model and revision.
  • State whether it is a limit, reference condition or guaranteed acceptance value.
  • Name the product, pack layout, material, feeder and packs per cycle behind output.
  • Confirm utility conditions, access, floor load and maintenance clearance.
  • Move every critical value into the quotation, URS response and approved FAT protocol.

Buyer comparison matrix

Compare the same decision in both proposals

Use this matrix before comparing price. A blank or “standard” answer is an open commercial and technical risk.

DecisionDPP-260 documented basisDPP-140 quotation requirementAcceptance evidence
Product handlingFeeder depends on product shape, size, flow and filling behavior.Name the offered feeder, sample-test basis and product-contact parts.Representative samples, feeding misses, damage, orientation and stoppage log.
Pack geometryReference forming area 245 × 112 mm and feed stroke 40–120 mm.State forming window, stroke, cavity depth and usable drawing allowances.Approved drawing, formed samples, cavity measurements, registration and cut results.
Material routeTechnical document covers Alu-PVC and configured Alu-Alu routes.Name forming-web and lidding grades, roll data and offered forming system.Material certificates in scope, lot identification and seal/forming trial results.
OutputDocument describes 10–60 cycles/min; a standard table gives 40 cycles/min for a stated layout.Quote the usable rate and packs per cycle for the nominated format.Accepted packs, rejects, waste, stops and interventions during an agreed run.
Inspection and rejectionMissing-product detection and waste removal are described; exact camera scope is contractual.List defect classes, inspection hardware, reject logic and confirmation method.Approved challenge set, detection results, reject verification and disposition record.
ChangeoverGuided insertion and handle-lock methods are described for major stations.List format parts, tools, operator count, cleaning boundary and restart steps.Timed changeover from last good pack to approved first good pack.
Controls and dataReference component list includes Siemens control items; exact configuration is contractual.State HMI, PLC, recipes, roles, records, backup and interface functions.Approved functional tests, access checks, alarm tests and backup/restore record.
Documents and servicesNo universal qualification package is established by the source document.List drawings, manuals, certificates, protocols, training and site services line by line.Approved document index, revisions, signatures, open-item register and handover record.

Swipe horizontally to review all comparison columns.

Project fit

Choose from the operating job, not a catalogue label

1

Batch and campaign pattern

Use actual batch sizes, campaign length, cleaning frequency and format count. A platform that looks fast may lose more time in changeover and restart.

2

Accepted-output target

Convert demand into good packs per minute. Include planned operating time, efficiency, rejects and growth allowance before selecting a platform.

3

Product and feeder risk

Tablets, capsules, ampoules and irregular products create different feeding limits. Use real samples, including the difficult or fragile product.

4

Barrier and forming route

PVC, PVDC, multilayer thermoform and Alu-Alu projects must be reviewed with cavity depth, pitch, web behavior and seal method.

5

Line integration

Define standalone collection or synchronized transfer to coding, inspection, cartoning and downstream equipment before freezing the machine.

6

Evidence and approval

Decide who writes, executes, reviews and approves the URS response, drawings, FAT, deviations, training and site handover.

Capacity check

Calculate the cycle rate your project needs

Use demand, scheduled run time, an operating factor and packs per cycle. Then ask each supplier to prove that accepted output with the actual product and materials.

Do not compare “packs per hour” without the layout. Cycles per minute and packs per cycle must be stated together, with rejected packs and downtime recorded.
34.7 cycles/minMinimum planned cycle rate before adding any separate growth or contingency allowance.

Required cycles/min = accepted packs ÷ (hours × 60 × operating factor × packs/cycle).

Scale-up and transfer

Keep the pack and evidence chain transferable

If one platform is used for development and another for routine production, transfer the product and pack definition—not an assumption that every setting scales directly.

A

Lock the pack

Approved product, cavity drawing, forming web, lidding foil, print, seal, cut and opening criteria.

B

Record the process

Forming, feeding, sealing, registration, coding, inspection and reject settings with their operating windows.

C

Challenge the risks

Difficult product, material variation, start-stop events, splice handling, missing product and restart behavior.

D

Approve the output

Good packs, rejects, waste, interventions, deviations and retained samples under the approved test method.

FAT and retained evidence

Make both platforms pass the same acceptance logic

FAT decisionMethod to approveEvidence to retainQuestion answered
Web handlingRun nominated material lots through unwind, splice and tracking conditions.Material IDs, reel setup, tension settings, splice and tracking observations.Can the exact web feed consistently?
Forming repeatabilityForm the approved layout at agreed settings and sample points.Approved samples, settings, cavity measurements and defect log.Does the web form the approved geometry?
Seal processUse the agreed seal or integrity method across the operating window.Recorded settings, sample IDs and test results.Is there a usable process window for the material pair?
Registration and cuttingCheck artwork, print mark, perforation and cut position against limits.Printed samples, measurement results and drawing comparison.Does the finished card meet drawing and artwork controls?
Inspection and rejectionRun approved challenge defects and verify the complete reject path.Challenge set, detection results, reject confirmation and disposition record.Are defined defects detected and segregated?
Sustained runRun for the agreed duration under the frozen configuration.Start/stop times, gross and accepted output, rejects, waste, interventions and deviations.Can the complete process meet the accepted-output target?

Swipe horizontally to review all FAT columns.

Inquiry package

Send the inputs that change the configuration

HIJ can return a useful comparison only when both options are tied to the same product, pack and acceptance target.

Attach these six items

  • Product dimensions, photos, samples and handling limits
  • Finished blister drawing or required cavity layout
  • Forming web and lidding foil specifications
  • Daily demand, batch size, shifts and accepted-output target
  • Coding, inspection, rejection and line-interface requirements
  • Documentation, FAT, training and site-service boundary

Buyer questions

Frequently asked questions

What is the main difference between a DPP-260 and a DPP-140 blister machine?
The reliable comparison is not the model number alone. The DPP-260 has a documented medium-speed flat-plate reference platform. The DPP-140 must be defined by its current offered forming window, stroke, feeder, material route, controls and acceptance target. Compare both against the same approved pack and FAT method.
Which model is better for pilot or small-batch production?
Choose from batch size, format count, material use, cleaning, product feeding and accepted output. A compact option may reduce floor space or material use, but the supplier must prove it can make the approved pack and support the required evidence. Do not label a model “pilot” without the actual configuration and test boundary.
Which model is better for commercial production?
Select the option that meets required accepted packs per minute with the nominated product, material, feeder and layout, while leaving the agreed capacity margin. Confirm line interfaces, shift pattern, changeover demand and sustained-run evidence before treating either platform as the commercial choice.
What DPP-260 specifications are supported by the technical document?
The available DPP-260/360K document states a 245 × 112 mm maximum forming area, a 40–120 mm feed-stroke range and an adjustable 10–60 cycles/min punching-frequency range. It also provides a 40 cycles/min reference for a stated 57 × 80 mm four-sheet layout. Final values remain configuration- and contract-dependent.
How should the output of two blister machines be compared?
Compare cycles per minute, finished packs per cycle, scheduled run time, planned operating factor and accepted output together. During the FAT, retain gross output, accepted packs, rejects, waste, stops, interventions and deviations. A catalogue speed by itself is not comparable output.
Can the DPP-260 run both Alu-PVC and Alu-Alu packs?
The available DPP-260/360K technical document describes Alu-PVC and Alu-Alu project routes. The proposed forming system, tooling, cavity depth, web structure and output must be confirmed for the nominated pack. Do not assume the same output for thermoform and cold-form formats.
What should be included in a DPP-260 vs DPP-140 quotation?
Include the exact machine revision, station set, feeder, tooling, inspection, rejection, coding, controls, utilities, line interfaces, drawings, manuals, certificates in scope, FAT protocol, training, spare parts, site services, exclusions and buyer-supplied items.
What should the FAT prove before shipment?
The FAT should prove web handling, forming repeatability, feeding, seal performance, registration, cutting, coding, inspection, rejection and sustained accepted output using representative product and material lots. The approved protocol should define samples, instruments, acceptance limits, deviations and retained records before execution.

Configure before comparing price

Request one testable scope for both machine options

Send the product, blister drawing, materials, accepted-output target and FAT boundary. HIJ can identify what is known, what remains open and what must be proved before shipment.

Let's Design Your Production Line

Share your requirements and I'll personally craft a solution that maximizes your efficiency and profitability.