A capsule and tablet blister packing machine packages finished dose forms into blister cavities before sealing and cutting the packs. For a shared production platform, the important purchasing question is which product, pack and operating changes the configuration must cover. Send the intended SKU list so the machine, format parts and trial scope can be quoted together.
Start with every SKU
Build the proposal around a product-and-pack matrix rather than a single representative sample. Two products described as “capsules” or “tablets” can need different feeding, cavity and handling arrangements.
Product
Record the finished product dimensions, shape, surface condition, handling concerns and the supplier or grade where it affects the trial. Identify hard-shell capsules and softgels separately; a shared nominal size does not establish compatibility.
Pack
Supply the cavity arrangement, units per blister, outer dimensions, forming and lidding material specification, print registration and any coding or perforation requirements.
Production
State the accepted finished-pack rate for each SKU, batch size, sequence and number of format changes. Distinguish packs per minute, cavities per cycle and individual products per hour.
Downstream
Identify how packs leave the blister machine, the required orientation and any cartoning or manual packing interface.
Softgel projects follow the dedicated softgel blister packaging route, where shell handling and material selection can be reviewed in more detail.
Define the format set
The DPP-260 technical configuration covers tablet and capsule packaging applications. Connect each SKU and pack drawing to an explicit feeding and tooling schedule in the quotation.



Review the DPP-250 equipment route alongside the proposed DPP-260 configuration using the same product-and-pack matrix. Identify the feeding and format parts offered with each proposal.
Product presentation
Specify the feeder and product-contact parts for the intended geometry and feeding behaviour. Identify what stays installed and what must be adjusted or exchanged.
Forming
List cavity tooling by pack drawing and material route. Match the forming area, draw requirements and format layout to the proposed machine configuration.
Sealing and cutting
Review the sealing contact layout, web movement, print position and cutting geometry together. A similar pack outline is not sufficient to assume that all downstream tools can be reused.
Controls
Identify the settings, access levels, stored recipes and records included in the supplied control configuration. Separate a selected software function from a general claim of regulatory compliance.
Inspection
Name each check in scope and its reject response. Presence detection, appearance inspection and package-integrity testing are different functions; quote the required equipment and evidence explicitly.
Plan each changeover
Ask for a defined start condition and a defined production-release condition. A useful changeover review covers more than changing the cavity tool.
Prepare
Identify the outgoing and incoming SKU, approved setup information, format-part list, materials, cleaning responsibilities and the personnel involved. Record the starting condition consistently.
Change and set
Clear the preceding product and material under the site's procedure, exchange or adjust the specified parts, load the selected material and restore the agreed settings. Follow the supplied operating instructions and site safety procedures.
Check and release
Check the incoming product, pocket fill, pack presentation, registration, coding and sealing against the agreed criteria before production release. Record adjustments and the final setup used for the run.
For a quoted changeover target, agree what the clock includes: stoppage, cleaning, tool handling, material threading, setting, first-off checking and release. Report the observed result with the actual SKU pair, operators and conditions. Do not compare a tool-only change with another proposal's complete production changeover.
Check campaign time
Use your own scheduled hours and measured or proposed changeover window to see how much production time remains. This planning check does not estimate machine output or confirm product compatibility.
Include cleaning, setup, first-off checking and release in the changeover window. Deduct other planned stops from the scheduled hours before using the check.
Available production minutes = scheduled hours × 60 − format changes × complete minutes per change. With zero changes, a duration is not needed.
Compare quotation scope
Request an itemised offer for the same product-and-pack matrix. The useful comparison is what each proposal includes and how the configuration will be demonstrated, not a fixed “dual-product” price band.
Bring an existing URS or format matrix if you have one. Add only missing SKU drawings, the intended batch sequence and scope items that remain undecided. You do not need to rewrite the same project information into a second enquiry template.
Discuss your formatsBase equipment
Offered machine model, material route, controls and utilities, installation envelope and discharge arrangement.
Format package
Included feeder/contact parts and forming, sealing, cutting and coding-related format parts. Separate initial SKU sets from optional future sets and spare parts.
Inspection and accessories
Checks, reject handling, coding, material handling and line interfaces. Identify equipment provided by the buyer or another supplier.
Trials and acceptance
Products, materials, drawings, test time and evidence for each selected SKU. State how accepted output, rejects, stops and changeover observations will be recorded.
Delivery and support
Contracted documents, training, installation work, service responsibilities, commercial terms and exclusions. Define qualification work and customer production release separately.
Buyer questions
Can one acceptance trial cover several SKUs?
Yes, the trial plan can include several agreed tablet and capsule SKUs. List each product, pack drawing, material, format setup and acceptance criterion separately. A successful run on one SKU does not automatically release the other formats; the quotation should identify which runs and changeovers will actually be demonstrated.
Can another SKU be added later?
Submit the new product sample and pack drawing against the installed machine's configuration and existing format-part list. Review whether feeding, forming, sealing, cutting, inspection or control changes are needed before ordering parts. Treat the additional SKU as a defined extension, not an assumed feature of a universal recipe library.