Opens in a new tab

Tablet & capsule
blister packing

Plan tablet and capsule blister production with product-specific feeding, tooling and changeover requirements, priced as one equipment scope.

Discuss your formats
DPP-260 blister packing machine workshop view with product hopper and roll-film reels
DPP-260 blister packing machine

Your format brief

A capsule and tablet blister packing machine packages finished dose forms into blister cavities before sealing and cutting the packs. For a shared production platform, the important purchasing question is which product, pack and operating changes the configuration must cover. Send the intended SKU list so the machine, format parts and trial scope can be quoted together.

Choose a shared line

A mixed product portfolio does not automatically require two blister machines, and one shared platform does not provide two simultaneous production streams. Start with your production calendar, then define the hardware.

One family per campaign

A shared line can be reviewed against the feeding and tooling required for each run. Include the full changeover and release window in the schedule.

Demand at the same time

Compare independent production capacity as well as a shared-line proposal. A common platform still runs one approved setup at a time.

Frequent short batches

Compare time spent producing saleable packs with cleaning, format changes, first-off checking and interruptions. A headline cycle rate alone cannot settle the decision.

Equipment already on site

Identify what is installed, the spare capacity and the formats it covers before requesting another machine or an expansion package.

For a capsule-focused project, start with the capsule blister packing machine page. For a tablet-led project, review the tablet blister packing machine page. This page connects the two around the actual changeover scope.

Start with every SKU

Build the proposal around a product-and-pack matrix rather than a single representative sample. Two products described as “capsules” or “tablets” can need different feeding, cavity and handling arrangements.

Product

Record the finished product dimensions, shape, surface condition, handling concerns and the supplier or grade where it affects the trial. Identify hard-shell capsules and softgels separately; a shared nominal size does not establish compatibility.

Pack

Supply the cavity arrangement, units per blister, outer dimensions, forming and lidding material specification, print registration and any coding or perforation requirements.

Production

State the accepted finished-pack rate for each SKU, batch size, sequence and number of format changes. Distinguish packs per minute, cavities per cycle and individual products per hour.

Downstream

Identify how packs leave the blister machine, the required orientation and any cartoning or manual packing interface.

Softgel projects follow the dedicated softgel blister packaging route, where shell handling and material selection can be reviewed in more detail.

Define the format set

The DPP-260 technical configuration covers tablet and capsule packaging applications. Connect each SKU and pack drawing to an explicit feeding and tooling schedule in the quotation.

Mixed tablet and capsule blister pack examples in different cavity layouts
Finished tablet and capsule blister examples
DPP-250 blister machine layout with product hopper and guarded web path
DPP-250 equipment layout
Covered product-loading deck and blister web handling detail
Loading-deck and blister-web detail

Review the DPP-250 equipment route alongside the proposed DPP-260 configuration using the same product-and-pack matrix. Identify the feeding and format parts offered with each proposal.

Product presentation

Specify the feeder and product-contact parts for the intended geometry and feeding behaviour. Identify what stays installed and what must be adjusted or exchanged.

Forming

List cavity tooling by pack drawing and material route. Match the forming area, draw requirements and format layout to the proposed machine configuration.

Sealing and cutting

Review the sealing contact layout, web movement, print position and cutting geometry together. A similar pack outline is not sufficient to assume that all downstream tools can be reused.

Controls

Identify the settings, access levels, stored recipes and records included in the supplied control configuration. Separate a selected software function from a general claim of regulatory compliance.

Inspection

Name each check in scope and its reject response. Presence detection, appearance inspection and package-integrity testing are different functions; quote the required equipment and evidence explicitly.

Plan each changeover

Ask for a defined start condition and a defined production-release condition. A useful changeover review covers more than changing the cavity tool.

Prepare

Identify the outgoing and incoming SKU, approved setup information, format-part list, materials, cleaning responsibilities and the personnel involved. Record the starting condition consistently.

Change and set

Clear the preceding product and material under the site's procedure, exchange or adjust the specified parts, load the selected material and restore the agreed settings. Follow the supplied operating instructions and site safety procedures.

Check and release

Check the incoming product, pocket fill, pack presentation, registration, coding and sealing against the agreed criteria before production release. Record adjustments and the final setup used for the run.

For a quoted changeover target, agree what the clock includes: stoppage, cleaning, tool handling, material threading, setting, first-off checking and release. Report the observed result with the actual SKU pair, operators and conditions. Do not compare a tool-only change with another proposal's complete production changeover.

Check campaign time

Use your own scheduled hours and measured or proposed changeover window to see how much production time remains. This planning check does not estimate machine output or confirm product compatibility.

Include cleaning, setup, first-off checking and release in the changeover window. Deduct other planned stops from the scheduled hours before using the check.

Enter your campaign figures to calculate available production time.

Available production minutes = scheduled hours × 60 − format changes × complete minutes per change. With zero changes, a duration is not needed.

Compare quotation scope

Request an itemised offer for the same product-and-pack matrix. The useful comparison is what each proposal includes and how the configuration will be demonstrated, not a fixed “dual-product” price band.

Bring an existing URS or format matrix if you have one. Add only missing SKU drawings, the intended batch sequence and scope items that remain undecided. You do not need to rewrite the same project information into a second enquiry template.

Discuss your formats

Base equipment

Offered machine model, material route, controls and utilities, installation envelope and discharge arrangement.

Format package

Included feeder/contact parts and forming, sealing, cutting and coding-related format parts. Separate initial SKU sets from optional future sets and spare parts.

Inspection and accessories

Checks, reject handling, coding, material handling and line interfaces. Identify equipment provided by the buyer or another supplier.

Trials and acceptance

Products, materials, drawings, test time and evidence for each selected SKU. State how accepted output, rejects, stops and changeover observations will be recorded.

Delivery and support

Contracted documents, training, installation work, service responsibilities, commercial terms and exclusions. Define qualification work and customer production release separately.

Buyer questions

Can one acceptance trial cover several SKUs?

Yes, the trial plan can include several agreed tablet and capsule SKUs. List each product, pack drawing, material, format setup and acceptance criterion separately. A successful run on one SKU does not automatically release the other formats; the quotation should identify which runs and changeovers will actually be demonstrated.

Can another SKU be added later?

Submit the new product sample and pack drawing against the installed machine's configuration and existing format-part list. Review whether feeding, forming, sealing, cutting, inspection or control changes are needed before ordering parts. Treat the additional SKU as a defined extension, not an assumed feature of a universal recipe library.

Discuss your formats

Share your current product-and-pack matrix or URS, plus the formats and production questions not yet covered. HIJ Machinery can review the proposed equipment scope with you before an itemised quotation.

Discuss your formats

Let's Design Your Production Line

Share your requirements and I'll personally craft a solution that maximizes your efficiency and profitability.