Product definition
Dosage form, dimensions, fragility, orientation, dust or static behavior, representative samples and approved handling limits.
Compare suppliers by the scope they can define, test and document for your product—not by a catalogue speed, country label or unverified price range.
The better manufacturer for a project is the one whose written proposal matches the approved product, forming and lidding materials, pack drawing, inspection boundary, accepted-output target and test plan.
A supplier name alone cannot prove product handling, forming repeatability, seal integrity, registration, reject control or sustained output. Those decisions require project-specific evidence.
Procurement rule: ask every shortlisted supplier to answer the same requirement set, in the same units, with the same inclusions and the same acceptance test. Only then are quotations comparable.
When a Romaco proposal is under review, use the DPP-260 versus Romaco proposal-scope comparison to record the same product, pack, options, document responsibilities and acceptance evidence.
Send a controlled input pack. If one supplier assumes PVC/Alu, another quotes cold form and a third excludes inspection, their prices and speeds do not describe the same purchase.
When comparing an Uhlmann proposal, use the DPP-260 versus Uhlmann proposal comparison to separate quoted equipment, options, document scope and test evidence.
When an IMA proposal is part of the shortlist, use the DPP-260 versus IMA proposal comparison to record the same product, pack, inspection and acceptance boundaries.
Dosage form, dimensions, fragility, orientation, dust or static behavior, representative samples and approved handling limits.
Cavity drawing, forming web, lidding material, printed artwork, perforation, cut geometry and finished-pack criteria.
Good packs over an agreed run—not only nominal cycles. Record rejects, stops, interventions, waste and planned operating conditions.
URS response, approved drawings, document index, trial method, FAT protocol, data to retain and open-item ownership.
Replace “high quality,” “GMP machine” and “turnkey” with questions a supplier can answer in writing and demonstrate during design review or FAT.
Which forming route, index motion, feeding method and sealing concept fit the approved product and material pair?
What is included in the quoted baseline, and which options, interfaces, utilities and downstream functions remain open?
How are forming, sealing, feeding, registration and cutting parts tied to the approved pack drawing and revisions?
Which defects are detected, how are rejects confirmed and segregated, and what records are available?
Which recipes, access controls, alarms, audit functions, backups and interfaces are required by the buyer?
Which documents, formats, languages, revisions and approval stages are included by contract?
What product, material lots, sampling, duration, instruments and objective criteria govern the FAT?
Who owns installation, training, spares, change notification, service access and software support after shipment?
Use this matrix during RFQ review. A confident answer without a drawing, method, record or named responsibility is still an assumption.
| Decision | Question for every supplier | Evidence to request | Risk if undefined |
|---|---|---|---|
| Product feeding | How will the actual product enter each cavity, and what happens after a miss or jam? | Feeding concept, sample trial, challenge results and recovery sequence | Damage, empty cavities, frequent intervention or unstable output |
| Materials & forming | Which exact web grades and operating window will be tested? | Material identification, approved samples, settings and forming measurements | Cavity variation, thinning, web tracking or unverified substitutions |
| Sealing | Which seal or integrity method and acceptance limit apply to the material pair? | Recorded settings, sampling plan, test method and results | A visually acceptable pack without proven integrity |
| Registration & cutting | How will print registration, perforation and cut position be controlled? | Approved artwork/drawing, measured samples and tolerances | Off-center print, damaged cavities or nonconforming card geometry |
| Inspection & rejection | Which defined defects will be challenged and how is reject confirmation recorded? | Challenge set, detection results, reject trace and disposition record | Undetected defects or uncertain reject segregation |
| Accepted output | Can the line sustain the agreed good-pack target under approved conditions? | Run duration, total output, good packs, rejects, waste and stoppage log | A rated speed that does not translate into usable production |
| Documentation | What is supplied, when, in which format, and who approves revisions? | Document index, responsibility matrix, review schedule and final status | Late qualification work, missing records or scope disputes |
| Service boundary | What support, spares, access and response process are contractually included? | Service scope, parts list, contacts, exclusions and escalation path | Unplanned cost or prolonged recovery after handover |
A model, nominal speed and base price with limited product or test detail.
When comparing country-of-origin options, use the Chinese versus European supplier scope comparison to normalize product fit, accepted output and quotation boundaries without assuming country proves performance.
A stated machine baseline connected to the product, pack, tooling, interfaces, options and exclusions.
A configured proposal plus an agreed method for producing and retaining objective evidence.
A lower headline price may exclude format parts, inspection, coding, feeding development, downstream interfaces, documentation, trials, shipping or site work. A higher number may include items the other quotation leaves open.
Machine frame, stations, guards, controls, utilities and standard functions.
Each format set, feeder, coding parts, registration features and change parts.
Inspection points, rejection, verification, data functions and buyer interfaces.
Samples, material quantities, trials, FAT, documents, training and site services.
Buyer-supplied items, unresolved tests, shipping terms, utilities and third-party work.

A manufacturer comparison becomes useful when each supplier explains the selected platform, not simply when each submits a model name.
Thermoforming or cold forming must follow barrier, cavity, material and process requirements.
The product geometry and handling risk determine feeder design and operator intervention.
Define defects and data first; then specify sensors, vision and rejection functions.
Cartoning, coding, serialization or case handling require clear interface ownership.

Every requirement should be marked as compliant, configurable, optional, excluded, buyer-supplied or requiring a trial. “Can do” is not a sufficient design response when the solution depends on materials, samples or third-party equipment.
Request before order: a requirement-by-requirement response, preliminary configuration, option list, document index, responsibility matrix, utility list, trial assumptions and proposed acceptance strategy.
Where the supplier cannot confirm a requirement yet, agree on the sample, drawing, test or decision needed to close it—and who owns that action.
The FAT is not a last-minute machine demonstration. It is the planned method for checking the approved configuration with identified products and materials under agreed conditions.
Approved drawings, product and material lots, calibrated instruments, utilities, recipes and challenge sets.
Defined run duration, sampling, seal or integrity method, measurement points and inspection challenges.
Objective limits approved before execution for finished packs, accepted output, rejects, waste and deviations.
Raw results, samples, settings, alarms, stoppages, deviations, approvals and final disposition retained together.
Equipment documents can support the buyer’s qualification work, but do not replace the facility’s quality system, regulatory assessment, process validation or product-release responsibilities.
Send the same controlled input pack used for other suppliers. HIJ can then respond to the defined project instead of relying on a generic model recommendation.
Comments against the buyer’s product, pack, output, inspection, control, documentation and interface requirements.
Proposed machine route, tooling, options, utilities, line interfaces, assumptions and declared exclusions.
Products, materials, methods and acceptance evidence to be agreed for trials and FAT.
Included equipment and services separated from options, buyer inputs, transport and site activities.
Give each supplier the same product, pack, material, accepted-output, inspection, documentation and FAT requirements. Compare written scope, assumptions, exclusions and evidence—not only model names, nominal speed or headline price.
Send representative products, dimensions and handling risks; the cavity and finished-pack drawing; forming and lidding grades; artwork and coding needs; required output; defect and rejection requirements; line interfaces; utilities; documents; and the proposed acceptance boundary.
Not automatically. Verify who owns design decisions, tooling, testing, changes, documentation, service and the sales contract. A capable intermediary can add value, while a factory name alone does not prove project control.
Country is not a technical acceptance criterion. Compare the proposed configuration, build and test evidence, documentation, service boundary, lifecycle cost and contractual responsibility for your project.
Normalize the equipment baseline, format parts, feeding, inspection, coding, controls, interfaces, documents, trials, FAT, packaging, freight, site work, training, spares, payment terms, assumptions and exclusions. Do not treat unequal scope as an equal price comparison.
It should test the approved configuration with identified product and material lots, agreed methods, sampling and objective acceptance criteria. Retain settings, output, rejects, waste, stops, measurements, deviations and approvals.
No universal package should be assumed. Name each required document, template, language, approval stage, execution responsibility and site-support boundary in the quotation and contract.
Ask: “What evidence will prove that this exact configuration can produce our accepted pack under the agreed operating conditions?” The answer should connect requirements, design response, test method, acceptance limits and retained records.
Compare primary-pack routes and machine platforms.
Build a product-, pack-, process- and proof-led purchase scope.
Choose the forming route from barrier and pack requirements.
Separate equipment support from the buyer’s validation program.
Define interfaces and responsibility across the complete line.
Send product, pack and acceptance inputs for review.
Send your product and pack definition, materials, accepted-output target, inspection boundary and FAT expectations. HIJ can respond with a project scope you can compare line by line.